Centerline Engineering

This project consisted of a new Tool and Die Manufacturing and Office Facility including 10” reinforced concrete floors, 600 ton press foundations, (3) 25 ton bridge cranes, CMM room, wire burn room, grinding room and office area. The building envelope is structural steel with masonry, insulated wall panels, glass curtain wall and a membrane roof system. The mechanical and electrical included complete air conditioning of the manufacturing area, snow melt at entrances, high efficiency fluorescent high bay fixtures, back up generator and equipment hook up.

Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering Centerline Engineering
TOP