Spectrum Health Fred and Lena Meijer Heart Center

Pioneer erected 1,700 tons of steel for this 10-story heart center. There is a curved radius at the north end and a 120,000 lb transfer girder was built on-site and erected over the ambulance entrance.

Spectrum Health Fred and Lena Meijer Heart Center Spectrum Health Fred and Lena Meijer Heart Center Spectrum Health Fred and Lena Meijer Heart Center Spectrum Health Fred and Lena Meijer Heart Center Spectrum Health Fred and Lena Meijer Heart Center
TOP